This project includes the installation of Complex Pedestrian Ramps in Queens and Staten Island.

Work Completed Includes:

- Utility poles, street lighting, traffic systems, and FDNY fire alarm relocation or               removal for new ramps.

- Installation of 11 manholes and 25 catch basins to improve the flow of storm                sewers

- Installation of 8” and 12” DIP water main, and 4 fire hydrants

- Upon completion of the underground work, roadways restoration along with new         sidewalks and curbs will be completed.