HWP19QRC
This project includes the installation of Complex Pedestrian Ramps in Queens and Staten Island.
Work Completed Includes:
- Utility poles, street lighting, traffic systems, and FDNY fire alarm relocation or removal for new ramps.
- Installation of 11 manholes and 25 catch basins to improve the flow of storm sewers
- Installation of 8” and 12” DIP water main, and 4 fire hydrants
- Upon completion of the underground work, roadways restoration along with new sidewalks and curbs will be completed.